back

Turbine Blade Failure Analysis

The images depicted above outlines a redesign and optimization project do to blad failure. A PSI client was experiencing premature cracking failures in the first stage turbine blades in their land based gas turbine engine. A premature failure is extremely costly in terms of both downtime and maintenance expense. PSI was able design a superior cooling scheme for the blade which is anticipated to improve part life by a factor of 5X.

PSI home PSI home PSI home
PSI home
about PSI
what we do
portfolio
services
contact us